Checklist for Fireproofing Steel Barndominiums

A steel barndominium can still fail in a fire, even though steel itself does not burn. When heat climbs, steel can lose strength fast, so I’d check four things from the start: the fire rating, the separation between home and shop areas, the sealing around every opening, and the inspection plan after move-in.
If I wanted the short version, it would be this:
- Confirm the right fire-resistance rating for steel, walls, floors, and ceilings in the permit drawings
- Use tested, listed systems for steel protection and firestopping
- Separate living space from garage or shop space with rated walls, ceilings, and a 20-minute fire-rated door
- Seal every penetration and joint around pipes, ducts, wires, and framing changes
- Inspect and maintain alarms, doors, coatings, and damaged areas after any work
This matters even more in Canada, where many barndominiums mix a home with a garage, shop, or farm-use space. That can change code rules based on occupancy, building size, and distance to property lines. In some cases, a small gap or one field change can undo the fire rating of a full assembly.

Steel Barndominium Fireproofing Checklist: 4 Stages to Fire Safety
Fire blocking BS, beware if you’re building a barndo or metal building.
sbb-itb-d6e8a6a
Quick comparison
| Check area | What I’d verify | Common problem |
|---|---|---|
| Fire ratings | Permit drawings match code and occupancy use | Plans are vague or missing rated details |
| Steel protection | SFRM, intumescent coating, or gypsum matches a tested listing | Wrong system used in the wrong location |
| Home-to-shop separation | Continuous rated wall/ceiling between Group C and Group F space | Gaps at chases, beam pockets, or attic spaces |
| Doors | 20-minute rated assembly with self-closing hardware | Missing label, poor latch, non-rated changes |
| Penetrations | ULC-listed firestop for each pipe, duct, wire, or conduit | One sealant used for everything |
| Move-in and after | Smoke alarms, heat detectors, extinguishers, repairs logged | Damage from later electrical, plumbing, or HVAC work |
I see this checklist as a before-build, before-move-in, and after-renovation review. It helps keep the fire design intact from the first drawing to day-to-day use.
Stage 1: Confirm Fireproofing Materials and Rated Assemblies
Verify required fire-resistance ratings
Check the required fire-resistance rating for each structural element in the approved drawings and permit set.
Code-rated fire separations are required between residential Group C areas and shop or utility areas classified as Group F, Division 2 or 3. Make sure those separation details are clearly shown in the approved plans. If the drawings are vague here, that can turn into a problem on site fast.
Confirm the protection method for exposed or critical steel
Not every fireproofing method fits every situation. Spray-applied fire-resistive material (SFRM) is often a good fit for hidden structural steel above ceilings or in industrial bays. Intumescent coatings are a better pick for exposed architectural steel where looks matter. Gypsum board enclosures are common in living areas and at residential-to-shop separations.
The protection method must match a tested, listed assembly approved for that location, and fireproofing systems should be ULC-listed.
| Method | Durability | Appearance | Typical Use |
|---|---|---|---|
| Spray-Applied (SFRM) | High insulating value; can be susceptible to mechanical damage if exposed | Thick, textured, industrial finish | Best for hidden steel; vulnerable to impact if exposed |
| Intumescent Coating | Very durable; resists impact | Smooth, paint-like finish; preserves the shape of the steel | Best for exposed steel with a smooth finish |
| Gypsum Board Enclosure | High; protected by outer layers | Clean, boxed-in look | Best for living areas and rated separations |
Check surface preparation and installed thickness
Clean steel thoroughly before application. Remove dust, oil, rust, loose scale, and moisture.
After installation, measure thickness against the tested assembly specifications, not by guesswork. An independent inspector should verify thickness and adhesion before drywall, ceilings, or other finishes go in. Once the steel is protected, check the fire separation between living and utility spaces.
Stage 2: Verify Fire Separation Between Living and Utility Spaces
Separate garage, shop, and living areas
Steel barndominiums often mix living space with work or storage space. That setup can work well, but the fire separation has to be checked with care.
Review the rated separation between the dwelling and any attached garage, shop, or storage area. Treat the home as Group C and the attached garage, shop, or storage space as Group F, Division 2 or 3, as applicable. Confirm that classification with your local building official before construction starts.
The rated assembly needs to stay continuous through beam pockets, chases, and penetrations. Even a small gap can break the separation. If the plan includes a secondary suite, that suite needs its own rated separation too.
Once you’ve marked the separation line, move to the door assembly.
Inspect fire-rated doors and closing hardware
Use a 20-minute fire-rated door assembly between the garage or shop and the home. That rating covers the full assembly – the slab, frame, hinges, and hardware – not just the door panel.
Check for a permanent metal label on the hinge edge or at the top of the door. No label usually means the door is not fire-rated.
Then test the self-closing hardware. Open the door to a 45-degree angle and let it go. It must close and latch on its own.
A few common issues can void the rating:
- Pet doors or cat flaps cut into the slab
- Decorative glass cutouts with non-rated glass
- Weatherstripping that is ripped, missing, or flattened
After the door check, look at any hidden route that could let fire get around the separation.
Review concealed spaces and exterior wall exposure
Hidden paths are often where fire separations fail. Attic voids, wall cavities, and service chases can let fire and smoke move past a rated wall if they aren’t blocked the right way.
In wildland-urban interface (WUI) zones, all vents that pass through the building envelope must have 1/8 in. (3 mm) corrosion-resistant mesh to help stop embers from getting into attic or wall cavities. If the build sits near property lines, calculate the limiting distance for any shop elevation with large overhead doors or a lot of glazing. Those openings have a big effect on fire-spread exposure calculations.
Next, inspect penetrations, joints, and system interfaces.
Stage 3: Check Penetrations, Joints, and System Interfaces
Once the rated separation is in place, inspect every opening, joint, and attachment that passes through it.
This step matters more than many people think. A fire-rated assembly can fail because of one unsealed opening. Even a small gap around a pipe or conduit can void the rating. Every penetration through a rated wall, floor, or ceiling needs proper firestopping. That includes plumbing, electrical, and HVAC penetrations such as supply lines, drain pipes, conduits, ducts, and condensate lines.
In British Columbia and across Canada, use listed firestopping for every penetration through a rated assembly. Structural attachments need the same level of care. Mezzanine ledgers, catwalk brackets, and overhead crane rail mounts should be checked to make sure they don’t weaken the fire-resistance rating of the primary steel structure. Protect these attachments using the rated assembly details shown in the approved drawings.
Match firestopping products to tested assemblies
Use only a ULC-listed or code-accepted firestop assembly matched to the penetration type. One product does not fit every job. A sealant rated for a plastic pipe sleeve won’t work properly around a steel conduit. Gap size, material type, and movement all change which product should be used.
Independent inspectors can verify full coverage and proper depth to confirm the product has bonded correctly to the substrate. If the steel surface had dirt, oil, or rust when the product was applied, the bond may have failed.
Check seams, slab edges, and field modifications
Fire separations often fail at transition points, so give these areas extra attention:
- Slab edges where the floor assembly meets the exterior wall
- Overhead door jambs between the shop and living areas
- Framing transitions where steel meets wood or where different steel gauges connect
- Thermal breaks at girts and purlins, which should not create unprotected gaps in the fire-rated envelope
Any site change made after the original fireproofing installation, such as modifications to barndo house kits,, such as a new electrical circuit for a welder or compressor, a new plumbing rough-in, or a relocated duct, must be re-inspected for fire-stop integrity.
After all penetrations and joints are sealed, move to inspection records and ongoing protection systems.
Stage 4: Inspect, Test, and Maintain Fire Protection Over Time
Verify inspection records and installed condition
After you seal the rated assemblies, shift from install checks to inspection, testing, and upkeep.
Fireproofing doesn’t stay perfect forever. It gets worn down, bumped, and damaged over time. Once other trades wrap up their work, go back and inspect every accessible steel member for spots where spray-applied fireproofing or intumescent coatings have chipped, cracked, or peeled.
A qualified inspector should check thickness and adhesion, then log any repairs. It also helps to keep written records of the fireproofing products used, especially if you deal with later inspections or renovations.
Review alarms, sprinklers, extinguishers, and exits
Once the structure is protected, finish the life-safety layer. These systems give people time to get out while the protected steel keeps carrying its load.
Every bedroom needs an interconnected smoke alarm, so if one alarm goes off, the whole home hears it. Heat detectors should also be installed in utility and shop areas.
You’ll want to confirm the basics are covered:
- Detection: Interconnected smoke alarms in all bedrooms, plus heat detectors in utility and shop areas
- Suppression: Fire extinguishers on every floor, with extra units near the workshop and kitchen; if a sprinkler system is installed, confirm that it’s working before move-in
- Exits: Clear exit routes and proper firefighter access points from outside
- Utilities: A professional inspection of the electrical and heating systems
Set a maintenance schedule after occupancy
After move-in, keep a close eye on any area affected by renovations or mechanical work. Plumbing, electrical, and HVAC jobs can all damage fireproofing, so reinspect every affected area once that work is done.
Fire doors need attention too. Check them on a regular basis and make sure they self-close and latch as intended.
Write down every deficiency and every repair, then keep those records easy to find for later inspections or renovations.
Conclusion: Use This Checklist Before You Build, Before You Move In, and After Any Changes
Fire safety in a steel barndominium begins at permit review and carries on through every renovation or service change. The four stages need to work as one system, not as separate boxes to tick.
Rated assemblies, fire separation, sealed penetrations, and routine inspections all support each other. Miss one piece, and the whole setup can weaken.
That’s why occupancy classification comes first in every design decision. Canadian code follows occupancy, not building style, so mixed-use barndominiums need code review from day one.
For planning-stage pricing and guidance, Barndominiums Canada connects you with a verified Canadian provider.
FAQs
Do steel barndominiums need fireproofing?
Yes. Steel barndominiums need fireproofing to meet Canadian building code rules. Steel doesn’t burn, but that doesn’t mean it’s automatically fire-safe.
In most cases, you still need fire-rated separations between the living space and any attached workshop or storage area. Those separations are often rated for 45 minutes to 2 hours.
Fire safety also covers the rest of the setup, including:
- Smoke alarms
- Carbon monoxide alarms
- Self-closing fire-rated doors
- Proper egress routes
Think of it this way: non-combustible materials help, but code still looks at how fire and smoke could spread through the building.
What fire rating do I need?
The fire-resistance rating you need depends on your workspace’s occupancy classification.
For most setups, a home with an adjacent shop usually needs a 1-hour fire-resistance rating. That can drop to 45 minutes if the building has sprinklers and is no more than three storeys tall.
Medium-hazard industrial spaces (Group F-2) usually need a 2-hour rating. The same often applies to ground-level shops with direct street access.
Codes can vary by province, so check your local rules before you build. In Ontario, that means looking at the Ontario Building Code. Elsewhere in Canada, use the provincial code that applies to your location.
What can void a fire separation?
A fire separation is voided when the rated assembly is no longer continuous or intact. In plain terms, once that wall or ceiling has a gap, a failure, or an unsealed penetration, it no longer does the job it was built to do.
That can happen in a few common ways:
- Gaps or damage in rated walls or ceilings
- Unsealed openings where pipes, ducts, cables, or other items pass through
- Beam pockets or smoke-tight details that aren’t kept in place
- Rated doors that are left open
- Missing self-closing devices on rated doors
- Self-closing devices that are installed but not working properly
Even a small break in the assembly can void the fire separation. That’s why continuity matters so much from one end of the assembly to the other.